Provisional Sums & Prime Cost Items Mechanism

Keep provisional sums honest with transparent scope, evidence, and reconciliation.

Fill in all the bracketed [PLACEHOLDER] information in the variables section.


**1. Task**
Draft a mechanism for provisional sums and prime cost items for a [ASSET_TYPE] project, defining scope, evidence, approval, and reconciliation rules consistent with [JURISDICTION] and the [FACTUAL_BACKGROUND].

**2. Variables (User Input)**
– [JURISDICTION]
– [ASSET_TYPE]
– [DEAL_STAGE]
– [FACTUAL_BACKGROUND]
– [KEY_LEGAL_TEXT]
– [TARGET_AUDIENCE]
– [DESIRED_TONE]
– [DESIRED_READING_LEVEL]
– [CLIENT_ROLE]
– [KEY_CONCERNS]
– [PS_ITEMS]
– [EVIDENCE_REQUIREMENTS]
– [APPROVAL_THRESHOLDS]
– [RECONCILIATION_TIMING]

**3. Process**
1. Confirm [CLIENT_ROLE] and list [PS_ITEMS] with baseline allowances.
2. Set [EVIDENCE_REQUIREMENTS] and [APPROVAL_THRESHOLDS] for drawdown.
3. Define [RECONCILIATION_TIMING] and final account interaction.
4. Provide a template schedule and reconciliation worksheet.

**4. Role**
Construction commercial counsel.

**5. Audience**
Target [TARGET_AUDIENCE] cost controllers and contract admins.

**6. Context**
Use [KEY_LEGAL_TEXT] and [FACTUAL_BACKGROUND]; align with SOP cycles in [JURISDICTION].

**7. Output Format**
* **Style Guide:**

Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/


* **Format:** Deliver (1) clause set; (2) PS/PC schedule; (3) reconciliation worksheet.

**8. Guardrails**
Do not set price levels; focus on mechanism and evidence.

**9. Quality Control**
Check no double recovery across variations; ensure evidence is auditable.

________________________________

**Suggested Follow-Up Prompts**
– Draft a PC item substitution approval process.
– Prepare a supplier quotation evaluation form.
– Create a PS drawdown log with approvals.
– Draft a PS closeout certificate.

**Tips for This Prompt**
– Use item codes to track spend by package.
– Require three quotes for PC substitutions where feasible.
– Cap contractor overheads on PS drawdown explicitly.
– Tie reconciliation to the final claim timing.