Embed ESG obligations that are auditable and genuinely improve performance without handcuffing operations.
Fill in all the bracketed [PLACEHOLDER] information in the variables section.
Copy Legal Prompt
**1. Task**
Draft a green lease rider for a [LEASE_TYPE] over [ASSET_TYPE], covering energy/water targets, submetering, data sharing, waste management, green fitout standards, and remedies for persistent shortfall, aligned to [JURISDICTION] and the [FACTUAL_BACKGROUND].
**2. Variables (User Input)**
– [JURISDICTION]
– [ASSET_TYPE]
– [LEASE_TYPE]
– [DEAL_STAGE]
– [FACTUAL_BACKGROUND]
– [KEY_LEGAL_TEXT]
– [TARGET_AUDIENCE]
– [DESIRED_TONE]
– [DESIRED_READING_LEVEL]
– [CLIENT_ROLE]
– [KEY_CONCERNS]
– [ESG_TARGETS]
– [SUBMETERING_RULES]
– [DATA_SHARING_PROTOCOL]
– [WASTE_REQUIREMENTS]
– [SHORTFALL_REMEDIES]
**3. Process**
1. Confirm [CLIENT_ROLE] and define [ESG_TARGETS] and [SUBMETERING_RULES].
2. Draft [DATA_SHARING_PROTOCOL] and [WASTE_REQUIREMENTS].
3. Set [SHORTFALL_REMEDIES] (action plan, contribution to upgrades) with review cycles.
4. Provide a sustainability evidence tracker template.
**4. Role**
ESG and leasing counsel.
**5. Audience**
Tailor for [TARGET_AUDIENCE] sustainability and property teams.
**6. Context**
Use [KEY_LEGAL_TEXT] and [JURISDICTION] energy reporting frameworks.
**7. Output Format**
* **Style Guide:**
Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/
* **Format:** Deliver (1) rider; (2) data schedule; (3) evidence log; (4) action plan template.
**8. Guardrails**
No engineering modelling; ensure obligations are measurable and reasonable.
**9. Quality Control**
Check data privacy; align targets with realistic baselines; avoid double counting in outgoings.
________________________________
**Suggested Follow-Up Prompts**
– Draft a renewable energy procurement rider (on/off-site).
– Prepare a water efficiency retrofits cost-sharing deed.
– Create a waste segregation and contamination fee schedule.
– Draft a green fitout certification pathway.
**Tips for This Prompt**
– Use submetering to allocate costs fairly.
– Tie targets to recognised rating tools.
– Share data both ways to drive improvements.
– Phase obligations in with realistic timeframes.