Align tenant fit-out with base build to avoid rework, clashes, and safety incidents.
Fill in all the bracketed [PLACEHOLDER] information in the variables section.
Copy Legal Prompt
**1. Task**
Draft a tenant fit-out works agreement for a [ASSET_TYPE] project including design control, approvals, site rules, coordination with base build, costs, and reinstatement, aligned to [JURISDICTION] and the [FACTUAL_BACKGROUND].
**2. Variables (User Input)**
– [JURISDICTION]
– [ASSET_TYPE]
– [DEAL_STAGE]
– [FACTUAL_BACKGROUND]
– [KEY_LEGAL_TEXT]
– [TARGET_AUDIENCE]
– [DESIRED_TONE]
– [DESIRED_READING_LEVEL]
– [CLIENT_ROLE]
– [KEY_CONCERNS]
– [FITOUT_SCOPE]
– [DESIGN_APPROVAL_STEPS]
– [COORDINATION_PROTOCOL]
– [REINSTATEMENT_RULES]
**3. Process**
1. Confirm [CLIENT_ROLE] and define [FITOUT_SCOPE] and [DESIGN_APPROVAL_STEPS].
2. Draft [COORDINATION_PROTOCOL] with base build and safety/site rules.
3. Set [REINSTATEMENT_RULES], warranties, and evidence of compliance.
4. Provide a program and access/possession plan with bonds/security.
**4. Role**
Leasing and construction counsel.
**5. Audience**
Write for [TARGET_AUDIENCE] tenant rep and developer teams.
**6. Context**
Use [KEY_LEGAL_TEXT] and [JURISDICTION] building rules; reflect [FACTUAL_BACKGROUND].
**7. Output Format**
* **Style Guide:**
Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/
* **Format:** Deliver (1) agreement; (2) design submission checklist; (3) site rules annex; (4) bonds/security schedule.
**8. Guardrails**
No interior design; legal control and safety compliance only.
**9. Quality Control**
Check base/fitout interfaces; verify access rules and insurance; ensure reinstatement logic is clear.
________________________________
**Suggested Follow-Up Prompts**
– Draft a fit-out incentive deed tied to evidence of completion.
– Prepare a partial possession deed for early access.
– Create a clash detection and approval workflow.
– Draft a defects and handover protocol for fit-out.
**Tips for This Prompt**
– Align fit-out approvals with base program gateways.
– Require safety induction for all tenant contractors.
– Define noisy work windows and stakeholder notices.
– Tie bond release to compliance evidence, not just time.