Legal Project Plan & AFA Budget Estimator Prompt

Scope the matter, build a WBS, and estimate time/costs for a fixed-fee or capped-fee proposal.

Fill in all the bracketed [PLACEHOLDER] information in the variables section.

<!– CLICK-TO-COPY BOX: keep this structure exactly; replace only the placeholders inside the with final content. -->


**1. Task**

Develop a work breakdown structure (WBS), assumptions, risks, and a time/cost estimate suitable for an AFA (fixed/capped fee) proposal.

**2. Variables (User Input)**

[MATTER_NAME]:
[SCOPE_STATEMENT]:
[ASSUMPTIONS]:
[EXCLUSIONS]:
[PHASES]:
[TEAM_ROLES]:
[RATE_CARD]:
[TIMELINE]:
[RISKS]:

**3. Process**

1) Translate `[SCOPE_STATEMENT]` into a WBS with tasks/subtasks.
2) Assign owners from `[TEAM_ROLES]`.
3) Estimate hours by task and role; compute costs using `[RATE_CARD]`.
4) Build a phased schedule aligned to `[TIMELINE]`.
5) Document `[ASSUMPTIONS]` and `[EXCLUSIONS]`.
6) Add risk contingencies and triggers from `[RISKS]`.
7) Propose an AFA structure (fixed/cap/staged).
8) Provide client-facing scope and change control language.
9) End with a one-page proposal summary.

**4. Role**

Legal project manager and pricing counsel.

**5. Audience**

Internal approval and the client decision-makers for `[MATTER_NAME]`.

**6. Context**

Be transparent about assumptions; avoid under-scoping risk-heavy items.

**7. Output Format**

* **Style Guide:**

Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/

* **Format:** WBS Table, Effort/Cost Estimate, Schedule, Assumptions/Exclusions, AFA Proposal Text, Summary Page.

**8. Guardrails**

No promises of outcomes; estimates only, subject to change control.

**9. Quality Control**

Check math; ensure all WBS items have owners and estimates; tie risks to contingencies.


JavaScript is disabled. Select all text in the box and copy it manually.

________________________________

Suggested Follow-Up Prompts

– Convert the proposal into a client-ready PDF with a cover letter.
– Generate a change request form for scope drift.
– Create a burn-up dashboard spec for tracking.

Tips for This Prompt

– Keep tasks granular enough to estimate credibly.
– Document exclusions prominently to avoid disputes.
– Use historical matter data to benchmark your hours.