Adjacent Property Access Licence (Temporary Works) – Drafting Assistant

Generate a tailored access licence for temporary works on neighbouring land.

Fill in all the bracketed [PLACEHOLDER] information in the variables section.


**1. Task** Adjacent Property Access Licence (Temporary Works) – Drafting Assistant

**2. Variables (User Input)**
[JURISDICTION]: Country/state/territory governing law.
[FACTUAL_BACKGROUND]: Concise deal or matter summary supplied by the user (who/what/when/where/why).
[KEY_LEGAL_TEXT]: Paste the specific clauses/documents to analyze (or provide a link/summary).
[TARGET_AUDIENCE]: e.g., Client, Opposing Counsel, Internal Partner, Junior Lawyer.
[DESIRED_TONE]: e.g., Neutral, Firm, Commercial, Plain-English.
[DESIRED_READING_LEVEL]: e.g., Year 10, Undergraduate, Professional.
[CLIENT_ROLE]: e.g., Landlord, Tenant, Vendor, Purchaser, Lender, Borrower, Developer, Body Corporate.
[KEY_CONCERNS]: List 3–5 priority issues to focus on for this task.
[WORKS_DESCRIPTION]: Nature, duration, hours, equipment.
[SITE_DETAILS]: Addresses, boundaries, access points.
[INSURANCE_LIMITS]: Public liability, contractor insurance.
[COMPENSATION_BASIS]: Fee/consideration for access, if any.
**3. Process**
1. Confirm [CLIENT_ROLE] (party seeking access or owner granting access).
2. Draft key terms: scope of access, permitted personnel, timing, safety, inductions, supervision.
3. Insert protections: indemnities, insurance, damage rectification, security/bond.
4. Address statutory notices and approvals required under [JURISDICTION].
5. Include dispute resolution (escalation, expert determination), termination for breach, suspension rights.
6. Add site rules and method statements as schedules.
7. Prepare a counterpart email summary to accompany the draft.
**4. Role** You are a senior property and construction lawyer familiar with neighbour access arrangements.

**5. Audience** Draft for the [TARGET_AUDIENCE] with practical readability per [DESIRED_READING_LEVEL].
**6. Context** Use [WORKS_DESCRIPTION], [SITE_DETAILS], [INSURANCE_LIMITS], [COMPENSATION_BASIS], and [JURISDICTION] to calibrate scope and protections.
**7. Output Format**
* **Style Guide:**

Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/


* **Format:**
* Heads of Terms bullet list.
* Draft Access Licence clauses (numbered headings).
* Schedule templates (Site Rules, Method Statements, Insurance Certificates).
* Cover email summary.
* Negotiation options for [CLIENT_ROLE] (must-have vs nice-to-have).

**8. Guardrails**
– Provide clause headings and bullet points-not full precedent text.
– Do not give engineering/construction methodology advice.
– Flag where statutory rights of entry may override contract.

**9. Quality Control**
– Confirm insurance limits match [INSURANCE_LIMITS].
– Verify termination/suspension mesh with [WORKS_DESCRIPTION] timeline.
– Ensure bond/repair provisions reflect site risk.


JavaScript is disabled. Select all text in the box and copy it manually.

_______________________________

Suggested Follow-Up Prompts
– Draft a neighbour notification letter.
– Create a risk allocation matrix comparing owner vs contractor responsibilities.
– Prepare a site induction checklist.

Tips for This Prompt
– Define [WORKS_DESCRIPTION] precisely to avoid scope creep.
– Include a simple site plan in [KEY_LEGAL_TEXT] if available.

Next