Respond fast to contractor/subcontractor insolvency: secure the site, protect title, and keep program moving.
Fill in all the bracketed [PLACEHOLDER] information in the variables section.
Copy Legal Prompt
**1. Task**
Prepare an insolvency/default response plan covering step-in, security, PPSA, and subcontractor replacement.
**2. Variables (User Input)**
– [JURISDICTION]: (e.g., NSW, VIC, QLD, WA, SA, NT, TAS, ACT, England & Wales, Singapore, UAE, etc.)
– [CONTRACT_FORM]: (e.g., AS 4000-1997, AS 4902-2000, AS 2124-1992, GC21, FIDIC, NEC4, bespoke)
– [FACTUAL_BACKGROUND]: (bullet summary: project, parties, scopes, timeline)
– [KEY_LEGAL_TEXT]: (paste relevant contract clauses/schedules/special conditions)
– [EVIDENCE_SET]: (programs, notices, emails, site diaries, photos, minutes)
– [TARGET_AUDIENCE]: (e.g., Board, Project Director, Superintendent, Counsel, Adjudicator)
– [DESIRED_TONE]: (e.g., formal, assertive, neutral, conciliatory)
– [DESIRED_READING_LEVEL]: (e.g., plain English, Board-ready)
– [CLIENT_ROLE]: (e.g., Principal, Head Contractor, Subcontractor, Superintendent)
– [KEY_CONCERNS]: (list 3–5 focus areas relevant to this task)
– [INSOLVENCY_INDICATORS]: (non-payment, abandonment, statutory demand)
– [CRITICAL_TRADES]: (trades to prioritise for continuity)
– [SECURITY_INSTRUMENTS]: (BGs, retentions)
**3. Process**
1. Identify [INSOLVENCY_INDICATORS] and confirm default triggers.
2. Secure site, materials, and IP; invoke step-in where available.
3. Handle [SECURITY_INSTRUMENTS] lawfully and consider PPSA registrations.
4. Prepare replacement procurement with back-to-back obligations.
5. Draft communications to staff, clients, and suppliers.
**4. Role**
Specific Role: Construction disputes/insolvency interface lawyer.
**5. Audience**
For the [TARGET_AUDIENCE] (project directors/legal).
**6. Context**
Use [FACTUAL_BACKGROUND], [KEY_LEGAL_TEXT], [SECURITY_INSTRUMENTS], [CRITICAL_TRADES].
**7. Output Format**
* **Style Guide:**
Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/
* **Format:** Provide (A) a day-1 checklist; (B) template default/termination notices; (C) PPSA/PPSR steps; (D) a replacement subcontract plan.
**8. Guardrails**
– Avoid unlawful preference or voidable transaction risks-seek insolvency advice where needed.
– Do not expose confidential staff or payroll data.
– Maintain safety and compliance first.
**9. Quality Control**
– Check triggers and notice requirements before any termination.
– Verify title/ownership of materials before use.
– Ensure continuity plans meet program critical path needs.
JavaScript is disabled. Select all text in the box and copy it manually.
________________________________
Suggested Follow-Up Prompts
– Draft a deed with the insolvency practitioner to access materials/IP.
– Prepare a communication to principal/client about risk containment.
– Create a lessons learned log post-event.
Tips for This Prompt
– Keep an up-to-date contact tree for critical trades.
– Record stocktakes with photos and serial numbers.
– Engage the surety/bank early if a call is contemplated.