Temporary Works – Responsibility & Indemnity Matrix

Assign responsibility for temporary works, design checks, and safety to avoid gaps and disputes.

Fill in all the bracketed [PLACEHOLDER] information in the variables section.


**1. Task**

Create a temporary works responsibility matrix including design, certification, inspection, and removal obligations.

**2. Variables (User Input)**

– [JURISDICTION]: (e.g., NSW, VIC, QLD, WA, SA, NT, TAS, ACT, England & Wales, Singapore, UAE, etc.)
– [CONTRACT_FORM]: (e.g., AS 4000-1997, AS 4902-2000, AS 2124-1992, GC21, FIDIC, NEC4, bespoke)
– [FACTUAL_BACKGROUND]: (bullet summary: project, parties, scopes, timeline)
– [KEY_LEGAL_TEXT]: (paste relevant contract clauses/schedules/special conditions)
– [EVIDENCE_SET]: (programs, notices, emails, site diaries, photos, minutes)
– [TARGET_AUDIENCE]: (e.g., Board, Project Director, Superintendent, Counsel, Adjudicator)
– [DESIRED_TONE]: (e.g., formal, assertive, neutral, conciliatory)
– [DESIRED_READING_LEVEL]: (e.g., plain English, Board-ready)
– [CLIENT_ROLE]: (e.g., Principal, Head Contractor, Subcontractor, Superintendent)
– [KEY_CONCERNS]: (list 3–5 focus areas relevant to this task)
– [TEMP_WORKS_TYPES]: (falsework, shoring, scaffolds, formwork)
– [CERTIFICATION_STANDARDS]: (codes/standards required)
– [INSPECTION_REGIME]: (frequency and roles)

**3. Process**

1. List [TEMP_WORKS_TYPES] and applicable [CERTIFICATION_STANDARDS].
2. Assign responsibility for design, checks, and sign-off.
3. Define [INSPECTION_REGIME] and record-keeping.
4. Set incident and defect response procedures.
5. Align indemnities and insurance requirements.

**4. Role**

Specific Role: Construction lawyer coordinating with engineers on legal allocation (not providing engineering design).

**5. Audience**

For the [TARGET_AUDIENCE] (site leadership and legal).

**6. Context**

Use [FACTUAL_BACKGROUND], [KEY_LEGAL_TEXT], [TEMP_WORKS_TYPES], [INSPECTION_REGIME].

**7. Output Format**

* **Style Guide:**

Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/

* **Format:** Provide (A) a responsibility matrix; (B) an inspection checklist; (C) certification templates; (D) an incident response SOP.

**8. Guardrails**

– Do not provide engineering calculations-limit to legal responsibilities.
– Comply with WHS/OHS and licensing laws.
– Avoid role confusion-name roles, not individuals.

**9. Quality Control**

– Check insurance aligns with responsibility allocation.
– Verify inspection frequencies meet statutory minima.
– Ensure sign-off templates reference correct standards.


JavaScript is disabled. Select all text in the box and copy it manually.

________________________________

Suggested Follow-Up Prompts

– Draft a subcontract temporary works schedule.
– Prepare a training brief on temporary works roles.
– Create a non-conformance notice template.

Tips for This Prompt

– Keep the matrix simple enough to be used on site.
– Tie inspection sign-offs to hold points.
– Document removal and make-good responsibilities early.