Rectify cladding lawfully with clear scope, approvals, warranties, and cost recovery pathways.
Fill in all the bracketed [PLACEHOLDER] information in the variables section.
Copy Legal Prompt
**1. Task**
Draft a rectification contract pack for combustible cladding, including scope definition, approvals, warranties, and recovery from responsible parties.
**2. Variables (User Input)**
– [JURISDICTION]: (e.g., NSW, VIC, QLD, WA, SA, NT, TAS, ACT, England & Wales, Singapore, UAE, etc.)
– [CONTRACT_FORM]: (e.g., AS 4000-1997, AS 4902-2000, AS 2124-1992, GC21, FIDIC, NEC4, bespoke)
– [FACTUAL_BACKGROUND]: (bullet summary: project, parties, scopes, timeline)
– [KEY_LEGAL_TEXT]: (paste relevant contract clauses/schedules/special conditions)
– [EVIDENCE_SET]: (programs, notices, emails, site diaries, photos, minutes)
– [TARGET_AUDIENCE]: (e.g., Board, Project Director, Superintendent, Counsel, Adjudicator)
– [DESIRED_TONE]: (e.g., formal, assertive, neutral, conciliatory)
– [DESIRED_READING_LEVEL]: (e.g., plain English, Board-ready)
– [CLIENT_ROLE]: (e.g., Principal, Head Contractor, Subcontractor, Superintendent)
– [KEY_CONCERNS]: (list 3–5 focus areas relevant to this task)
– [CLADDING_AUDIT]: (findings and affected elevations)
– [RECTIFICATION_SCOPE]: (remove/replace details)
– [RESPONSIBLE_PARTIES]: (designer, builder, supplier)
**3. Process**
1. Summarise [CLADDING_AUDIT] and statutory directives.
2. Define [RECTIFICATION_SCOPE] with acceptance and testing.
3. Set warranties, supplier guarantees, and record requirements.
4. Draft recovery strategy against [RESPONSIBLE_PARTIES].
5. Plan occupant communication and safety measures.
**4. Role**
Specific Role: Construction defects/remediation lawyer.
**5. Audience**
For the [TARGET_AUDIENCE] (owners’ corporation/Principal).
**6. Context**
Use [FACTUAL_BACKGROUND], [KEY_LEGAL_TEXT], [CLADDING_AUDIT], [RECTIFICATION_SCOPE].
**7. Output Format**
* **Style Guide:**
Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/
* **Format:** Provide (A) a rectification contract schedule; (B) a warranty/guarantee pack; (C) a cost recovery memo; (D) resident communication templates.
**8. Guardrails**
– Avoid technical specification drafting-coordinate with fire engineers.
– Respect privacy of residents.
– Ensure safety and authority approvals before works.
**9. Quality Control**
– Check product bans/approvals for [JURISDICTION].
– Verify warranties are assignable and enforceable.
– Ensure recovery defendants and limitation periods are identified.
JavaScript is disabled. Select all text in the box and copy it manually.
________________________________
Suggested Follow-Up Prompts
– Draft a claim against responsible parties.
– Prepare an owner ballot/approval pack if required.
– Create a staged payment schedule tied to risk milestones.
Tips for This Prompt
– Maintain a photographic chain-of-custody during removal.
– Track waste disposal compliance for removed panels.
– Record all products and batch numbers for new installations.