Stand up an effective dispute board early: appointments, procedures, and engagement rules.
Fill in all the bracketed [PLACEHOLDER] information in the variables section.
Copy Legal Prompt
**1. Task**
Draft a dispute board establishment and operating procedure aligned to the contract and institution rules.
**2. Variables (User Input)**
– [JURISDICTION]: (e.g., NSW, VIC, QLD, WA, SA, NT, TAS, ACT, England & Wales, Singapore, UAE, etc.)
– [CONTRACT_FORM]: (e.g., AS 4000-1997, AS 4902-2000, AS 2124-1992, GC21, FIDIC, NEC4, bespoke)
– [FACTUAL_BACKGROUND]: (bullet summary: project, parties, scopes, timeline)
– [KEY_LEGAL_TEXT]: (paste relevant contract clauses/schedules/special conditions)
– [EVIDENCE_SET]: (programs, notices, emails, site diaries, photos, minutes)
– [TARGET_AUDIENCE]: (e.g., Board, Project Director, Superintendent, Counsel, Adjudicator)
– [DESIRED_TONE]: (e.g., formal, assertive, neutral, conciliatory)
– [DESIRED_READING_LEVEL]: (e.g., plain English, Board-ready)
– [CLIENT_ROLE]: (e.g., Principal, Head Contractor, Subcontractor, Superintendent)
– [KEY_CONCERNS]: (list 3–5 focus areas relevant to this task)
– [BOARD_COMPOSITION]: (one/three members and expertise)
– [APPOINTMENT_PROCESS]: (nomination and replacement)
– [MEETING_PROTOCOLS]: (frequency, site visits)
**3. Process**
1. Define [BOARD_COMPOSITION] and selection criteria.
2. Set [APPOINTMENT_PROCESS] and conflict checks.
3. Draft [MEETING_PROTOCOLS], submissions, and recommendations process.
4. Prepare dispute referral templates and timelines.
5. Align with arbitration/court interfaces.
**4. Role**
Specific Role: Construction dispute resolution lawyer with DAB/DRB experience.
**5. Audience**
For the [TARGET_AUDIENCE] (owner/contractor leadership).
**6. Context**
Use [FACTUAL_BACKGROUND], [KEY_LEGAL_TEXT], [BOARD_COMPOSITION].
**7. Output Format**
* **Style Guide:**
Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/
* **Format:** Provide (A) an establishment procedure; (B) operating rules; (C) referral templates; (D) a timeline and contact protocol.
**8. Guardrails**
– Maintain neutrality and independence of board members.
– Respect confidentiality and without prejudice frameworks.
– Avoid duplicating adjudication rights unless intended.
**9. Quality Control**
– Check consistency with contract/institution rules.
– Verify conflicts and independence disclosures.
– Ensure timelines work with project cadence.
JavaScript is disabled. Select all text in the box and copy it manually.
________________________________
Suggested Follow-Up Prompts
– Draft a standing agenda for site visits.
– Prepare a board member engagement letter.
– Create a guide for party case presentations.
Tips for This Prompt
– Appoint early-boards work best proactively.
– Limit slide decks-focus on facts and documents.
– Keep records of all board guidance and outcomes.