Latent Conditions & Site Risk – Surveys, Utilities & Contamination Review

Sift the noise from your Latent Conditions & Site Risk. Design risk, EOT/LDs and variations drive economics. Do this review once, capture the leverage, and lock in clean design, programme and make-good outcomes.

Fill in all the bracketed [PLACEHOLDER] information in the variables section.

<!– CLICK-TO-COPY BOX: keep this structure exactly; replace only the *(Author's Note: …)* placeholders inside the with final content. -->


**1. Task**

Conduct a structured legal risk review of the `Latent Conditions & Site Risk` using the inputs in Section 2. Identify issues, assess impact/likelihood, propose negotiation positions, and prepare a concise executive summary and comment log tailored to the client’s role and risk appetite.

**2. Variables (User Input)**

[JURISDICTION]: (e.g., Australia (SOPA by State, NCC/BCA, WHS), US (AIA, lien laws, OSHA, ADA), UK (JCT/NEC4, CDM), EU (BREEAM), Middle East (FIDIC, Civil Codes), Asia (FIDIC/local codes), Global (FIDIC Red/Yellow/Silver, NEC4, JCT, ISO 19650 (BIM), ISO 45001, ISO 14001, LEED/BREEAM/NABERS/Green Star))
[GOVERNING_LAW]: (if different from [JURISDICTION])
[CLIENT_ROLE]: (e.g., "Owner/Principal/Landlord/Developer", "Tenant/Occupier", "Main Contractor/EPC", "Subcontractor", "Architect/Engineer/Design Consultant", "Superintendent/Contract Administrator", "Facilities Manager/Service Provider")
[TARGET_AUDIENCE]: (e.g., "GC/Head of Legal", "Project Director", "Development/Asset Manager", "Procurement", "Facilities/Operations", "Board/Exec")
[DESIRED_TONE]: (e.g., "plain-English, project-aware", "board-ready concise", "lawyer-to-lawyer detailed")
[DESIRED_READING_LEVEL]: (e.g., "Executive", "Undergraduate", "Lawyer-to-lawyer")
[FACTUAL_BACKGROUND]: (site; asset; scope; programme; milestones; approvals; drawings/specs; responsibilities; incentives; rent/price; security; insurances)
[DOCUMENT_TYPE]: (agreement under review-paste name/version)
[COUNTERPARTY]: (legal name, identifiers, address)
[PARTIES]: (all parties with identifiers)
[EFFECTIVE_DATE]: (YYYY-MM-DD)
[TERM]: (tenor/renewals; sunset; defects period; reinstatement/make-good)
[TRANSACTION_VALUE]: (rent/base building costs/fit-out price/contract sum; LDs; incentives; security; adjustments)
[KEY_LEGAL_TEXT]: (paste the agreement or relevant extracts/redlines)
[RELATED_SCHEDULES]: (scope/drawings/specs; programme; milestones; rent/schedules; incentives; approvals; safety; environmental; BIM protocol; testing/commissioning; O&M manuals; warranties; insurances; bank guarantees/retention; variation/change; defects; make-good)
[LINKED_AGREEMENTS]: (AFL/lease/works deed; development agreement; construction contract; consultancy appointments; subcontracts; security deeds; finance/step-in; services contracts; wayleaves/easements; utility deeds; DR/ADR agreements)
[REFERENCE_POLICIES]: (house positions: design responsibility; latent conditions; EOT/LDs; payment & SOP; security/retention; safety; environmental; QA/testing; rent review; outgoings; make-good; assignment/subletting; exclusivity; green lease; insurance)
[REGULATORY_FRAMEWORK]: (building codes (NCC/BCA/IBC), planning/permits, WHS/OSHA/CDM, accessibility (DDA/ADA), cladding/fire safety, SOPA/lien laws, environment/contamination, heritage, energy ratings (NABERS/LEED/BREEAM), ISO 19650/BIM)
[RISK_APPETITE]: ("low", "moderate", "high")
[KEY_CONCERNS]: (3–5 focus areas; e.g., Scope/Design Responsibility, Programme/EOT & LDs, Variations/Change Control, Latent Conditions/Access & Services, Payment/SOPA & Security, Insurance/Indemnities, Defects/Warranties, Safety/WHS-CDM, Environmental/Contamination, Rent Review/Outgoings/Incentives, Make-Good/Reinstatement, Assignment/Subletting/Consents, Exclusivity/Co-tenancy/Use, Green Lease/Sustainability)
[NEGOTIATION_POSITION]: ("client-friendly", "balanced", "counterparty-friendly")
[DEAL_TIMELINE]: (key approvals; long-stop; phased handover; rent commencement; PC/HC dates; reinstatement)
[SITE_DETAILS]: (title/plan; easements; services; constraints; neighbours; access hours; noise/work restrictions)
[SCOPE_AND DESIGN]: (responsibilities; approvals; BIM; shop drawings; design development; value engineering)
[PROGRAMME_AND MILESTONES]: (critical path; long-lead; EOT triggers; notice windows)
[PAYMENT_AND SECURITY]: (SOPA process; valuations; retention/bank guarantees; performance bonds; parent guarantees)
[EOT_AND LDs]: (qualifying events; concurrency; caps; rates; grace; mitigation)
[VARIATIONS_AND CHANGE]: (procedure; approvals; pricing; time impact)
[LATENT_CONDITIONS_AND SITE RISKS]: (surveys; utilities; contamination; heritage; neighbours; permits)
[DEFECTS_AND WARRANTIES]: (rectification; access; DLP; manufacturer warranties; warranty assignments)
[RENT_REVIEW_AND OUTGOINGS]: (CPI/market/fixed; caps/collars; operating expenses; audits; landlord works)
[MAKE_GOOD_AND REINSTATEMENT]: (scope; wear & tear; incentives; dilapidations)
[INSURANCE_AND LIMITS]: (CAR; PL; PI; workers comp; property; DSU/BI; levels; endorsements)
[QUESTIONS_FOR_CLIENT]: (open points needing instruction)
[EXHIBITS]: (attachments the output should reference)
[SURVEYS_AND RELIANCE]: (rules)
[UTILITY_LOCATES_AND ACCESS]: (process)
[CONTAMINATION_AND HAZMAT]: (policy)

**3. Process**

1. Confirm `[CLIENT_ROLE]`, `[JURISDICTION]`/`[GOVERNING_LAW]`, asset/site, scope/design responsibilities, programme and milestones, `[RISK_APPETITE]` and `[NEGOTIATION_POSITION]`.
2. Parse `[KEY_LEGAL_TEXT]`, `[RELATED_SCHEDULES]` and `[LINKED_AGREEMENTS]`; map clauses to `[KEY_CONCERNS]` and operational mechanics across leasing, development and construction.
3. Extract mechanics: design responsibility and approvals; BIM/protocols and information requirements; programme/critical path, EOT triggers and notice windows; LD rates/caps and evidence; variation/change-order workflow and pricing; latent conditions/site access/services; safety/WHS/CDM duties; testing/commissioning, completion and defects; payment/SOPA and valuation; security/retention/bonds/guarantees; insurance lines/endorsements; environmental/contamination/cladding/fire; handover/O&M manuals/warranty assignments; rent review formulas and resets; incentives/abatements; outgoings/audit; assignment/subletting/consents; exclusivity/co-tenancy/use; make-good/reinstatement and dilapidations.
4. Benchmark against `[REGULATORY_FRAMEWORK]` and `[REFERENCE_POLICIES]`; note deviations and hotspots.
5. For each `[KEY_CONCERNS]` area, assess exposure and propose primary/fallback/walk-away positions with rationale.
6. Validate consistency across AFL/lease, works deeds, construction contracts, consultancy appointments, subcontracts and services/FM agreements; ensure critical flow-downs.
7. Identify drafting defects: vague scope/design risk; weak EOT notices; penalty-like LDs; unilateral variation powers; broad latent condition exclusions; SOPA non-compliance; missing/weak security; inadequate insurance/endorsements; unclear defects/DLP; ambiguous rent review/incentives; onerous make-good; restrictive assignment/sublet; weak safety/environment obligations.
8. Compile clarifying questions for Development/Project Director, Asset/Facilities, and Finance; list required artefacts.
9. Produce outputs in Section 7; mark ❗assumptions and information gaps.
10. Run Section 9 Quality Control and draft a brief email to the `[TARGET_AUDIENCE]` with leverage and next steps.

**4. Role**

Specific Role: a senior site risk/latent conditions counsel.

**5. Audience**

Your output must be tailored for the `[TARGET_AUDIENCE]` specified in the Variables and calibrated to the `[CLIENT_ROLE]`, `[RISK_APPETITE]`, and `[NEGOTIATION_POSITION]`.

**6. Context**

Use `[FACTUAL_BACKGROUND]`, `[KEY_LEGAL_TEXT]`, `[RELATED_SCHEDULES]`, `[LINKED_AGREEMENTS]`, and `[REFERENCE_POLICIES]` as primary context. Align with `[REGULATORY_FRAMEWORK]`.

**7. Output Format**

* **Style Guide:**

Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/

* **Format:** Deliver a complete review pack for the Latent Conditions & Site Risk consisting of: (1) an executive summary (≤10 bullets); (2) a risk heat-map (RAG) by `[KEY_CONCERNS]`; (3) a clause-by-clause comment log with clause references; (4) a negotiation positions table (primary/fallback/walk-away); (5) targeted redline *snippets*; (6) a programme/EOT & notices tracker (SOPA/lien calendar where relevant); (7) a handover & defects checklist (O&M, warranties); and (8) a short email to the `[TARGET_AUDIENCE]`.

**8. Guardrails**

Focus strictly on legal/contract/compliance risk-no engineering design, cost estimating or construction means/methods. Do **not** rewrite entire clauses; provide targeted bullet recommendations and optional redline *snippets*. Flag high-risk items: unclear design responsibility, EOT/notice traps, penalty LDs, unilateral variations, broad latent condition exclusions, SOPA/lien non-compliance, weak security/insurance, cladding/fire risks, onerous make-good, and over-restrictive assignment/subletting. If inputs are incomplete, state assumptions and take a conservative, defensible position.

**9. Quality Control**

Verify design responsibility and approvals; confirm programme/EOT triggers and notice windows; check LD rates/caps vs penalties; validate variation/change workflow; confirm latent condition and access/service risk allocation; check SOPA/lien processes; verify security/retention/bonds/parent guarantees; confirm insurance lines/endorsements/limits; validate testing/commissioning/completion/defects regime and warranty assignments; check rent review/incentives/outgoings mechanics; ensure make-good scope is clear and fair; confirm safety/WHS-CDM and environmental obligations; verify schedules/exhibits completeness `[EXHIBITS]`.


JavaScript is disabled. Select all text in the box and copy it manually.

________________________________

Suggested Follow-Up Prompts

  • Draft redline snippets for the highest-risk clauses in the Latent Conditions & Site Risk.
  • Prepare an EOT/LD risk model and notice calendar for the Latent Conditions & Site Risk.
  • Create a latent conditions/site access evidence pack request list for the Latent Conditions & Site Risk.
  • Build a rent review/incentives and outgoings calculator for the Latent Conditions & Site Risk.
  • Generate a defects/DLP and warranties assignment checklist for the Latent Conditions & Site Risk.

Tips for This Prompt

  • Paste real clause extracts/redlines into `[KEY_LEGAL_TEXT]` for precise comments.
  • Limit `[KEY_CONCERNS]` to the top 3–5 to sharpen negotiation focus.
  • Attach drawings/specs, programme, rent schedules, security/insurance evidence and BIM protocols in `[RELATED_SCHEDULES]`.