Bulletproof your Green Lease Addendum. Cladding, fire and sustainability set the floor. Do this review once, capture the leverage, so time and money don’t bleed through EOT traps or LDs.
Fill in all the bracketed [PLACEHOLDER] information in the variables section.
<!– CLICK-TO-COPY BOX: keep this structure exactly; replace only the *(Author's Note: …)* placeholders inside the with final content. -->
Copy Legal Prompt
**1. Task**
Conduct a structured legal risk review of the `Green Lease Addendum` using the inputs in Section 2. Identify issues, assess impact/likelihood, propose negotiation positions, and prepare a concise executive summary and comment log tailored to the client’s role and risk appetite.
**2. Variables (User Input)**
[JURISDICTION]: (e.g., Australia (SOPA by State, NCC/BCA, WHS), US (AIA, lien laws, OSHA, ADA), UK (JCT/NEC4, CDM), EU (BREEAM), Middle East (FIDIC, Civil Codes), Asia (FIDIC/local codes), Global (FIDIC Red/Yellow/Silver, NEC4, JCT, ISO 19650 (BIM), ISO 45001, ISO 14001, LEED/BREEAM/NABERS/Green Star))
[GOVERNING_LAW]: (if different from [JURISDICTION])
[CLIENT_ROLE]: (e.g., "Owner/Principal/Landlord/Developer", "Tenant/Occupier", "Main Contractor/EPC", "Subcontractor", "Architect/Engineer/Design Consultant", "Superintendent/Contract Administrator", "Facilities Manager/Service Provider")
[TARGET_AUDIENCE]: (e.g., "GC/Head of Legal", "Project Director", "Development/Asset Manager", "Procurement", "Facilities/Operations", "Board/Exec")
[DESIRED_TONE]: (e.g., "plain-English, project-aware", "board-ready concise", "lawyer-to-lawyer detailed")
[DESIRED_READING_LEVEL]: (e.g., "Executive", "Undergraduate", "Lawyer-to-lawyer")
[FACTUAL_BACKGROUND]: (site; asset; scope; programme; milestones; approvals; drawings/specs; responsibilities; incentives; rent/price; security; insurances)
[DOCUMENT_TYPE]: (agreement under review-paste name/version)
[COUNTERPARTY]: (legal name, identifiers, address)
[PARTIES]: (all parties with identifiers)
[EFFECTIVE_DATE]: (YYYY-MM-DD)
[TERM]: (tenor/renewals; sunset; defects period; reinstatement/make-good)
[TRANSACTION_VALUE]: (rent/base building costs/fit-out price/contract sum; LDs; incentives; security; adjustments)
[KEY_LEGAL_TEXT]: (paste the agreement or relevant extracts/redlines)
[RELATED_SCHEDULES]: (scope/drawings/specs; programme; milestones; rent/schedules; incentives; approvals; safety; environmental; BIM protocol; testing/commissioning; O&M manuals; warranties; insurances; bank guarantees/retention; variation/change; defects; make-good)
[LINKED_AGREEMENTS]: (AFL/lease/works deed; development agreement; construction contract; consultancy appointments; subcontracts; security deeds; finance/step-in; services contracts; wayleaves/easements; utility deeds; DR/ADR agreements)
[REFERENCE_POLICIES]: (house positions: design responsibility; latent conditions; EOT/LDs; payment & SOP; security/retention; safety; environmental; QA/testing; rent review; outgoings; make-good; assignment/subletting; exclusivity; green lease; insurance)
[REGULATORY_FRAMEWORK]: (building codes (NCC/BCA/IBC), planning/permits, WHS/OSHA/CDM, accessibility (DDA/ADA), cladding/fire safety, SOPA/lien laws, environment/contamination, heritage, energy ratings (NABERS/LEED/BREEAM), ISO 19650/BIM)
[RISK_APPETITE]: ("low", "moderate", "high")
[KEY_CONCERNS]: (3–5 focus areas; e.g., Scope/Design Responsibility, Programme/EOT & LDs, Variations/Change Control, Latent Conditions/Access & Services, Payment/SOPA & Security, Insurance/Indemnities, Defects/Warranties, Safety/WHS-CDM, Environmental/Contamination, Rent Review/Outgoings/Incentives, Make-Good/Reinstatement, Assignment/Subletting/Consents, Exclusivity/Co-tenancy/Use, Green Lease/Sustainability)
[NEGOTIATION_POSITION]: ("client-friendly", "balanced", "counterparty-friendly")
[DEAL_TIMELINE]: (key approvals; long-stop; phased handover; rent commencement; PC/HC dates; reinstatement)
[SITE_DETAILS]: (title/plan; easements; services; constraints; neighbours; access hours; noise/work restrictions)
[SCOPE_AND DESIGN]: (responsibilities; approvals; BIM; shop drawings; design development; value engineering)
[PROGRAMME_AND MILESTONES]: (critical path; long-lead; EOT triggers; notice windows)
[PAYMENT_AND SECURITY]: (SOPA process; valuations; retention/bank guarantees; performance bonds; parent guarantees)
[EOT_AND LDs]: (qualifying events; concurrency; caps; rates; grace; mitigation)
[VARIATIONS_AND CHANGE]: (procedure; approvals; pricing; time impact)
[LATENT_CONDITIONS_AND SITE RISKS]: (surveys; utilities; contamination; heritage; neighbours; permits)
[DEFECTS_AND WARRANTIES]: (rectification; access; DLP; manufacturer warranties; warranty assignments)
[RENT_REVIEW_AND OUTGOINGS]: (CPI/market/fixed; caps/collars; operating expenses; audits; landlord works)
[MAKE_GOOD_AND REINSTATEMENT]: (scope; wear & tear; incentives; dilapidations)
[INSURANCE_AND LIMITS]: (CAR; PL; PI; workers comp; property; DSU/BI; levels; endorsements)
[QUESTIONS_FOR_CLIENT]: (open points needing instruction)
[EXHIBITS]: (attachments the output should reference)
[RATINGS_AND TARGETS]: (rules)
[DATA_SHARING_AND METERING]: (process)
[IMPROVEMENTS_AND COST_SHARING]: (policy)
**3. Process**
1. Confirm `[CLIENT_ROLE]`, `[JURISDICTION]`/`[GOVERNING_LAW]`, asset/site, scope/design responsibilities, programme and milestones, `[RISK_APPETITE]` and `[NEGOTIATION_POSITION]`.
2. Parse `[KEY_LEGAL_TEXT]`, `[RELATED_SCHEDULES]` and `[LINKED_AGREEMENTS]`; map clauses to `[KEY_CONCERNS]` and operational mechanics across leasing, development and construction.
3. Extract mechanics: design responsibility and approvals; BIM/protocols and information requirements; programme/critical path, EOT triggers and notice windows; LD rates/caps and evidence; variation/change-order workflow and pricing; latent conditions/site access/services; safety/WHS/CDM duties; testing/commissioning, completion and defects; payment/SOPA and valuation; security/retention/bonds/guarantees; insurance lines/endorsements; environmental/contamination/cladding/fire; handover/O&M manuals/warranty assignments; rent review formulas and resets; incentives/abatements; outgoings/audit; assignment/subletting/consents; exclusivity/co-tenancy/use; make-good/reinstatement and dilapidations.
4. Benchmark against `[REGULATORY_FRAMEWORK]` and `[REFERENCE_POLICIES]`; note deviations and hotspots.
5. For each `[KEY_CONCERNS]` area, assess exposure and propose primary/fallback/walk-away positions with rationale.
6. Validate consistency across AFL/lease, works deeds, construction contracts, consultancy appointments, subcontracts and services/FM agreements; ensure critical flow-downs.
7. Identify drafting defects: vague scope/design risk; weak EOT notices; penalty-like LDs; unilateral variation powers; broad latent condition exclusions; SOPA non-compliance; missing/weak security; inadequate insurance/endorsements; unclear defects/DLP; ambiguous rent review/incentives; onerous make-good; restrictive assignment/sublet; weak safety/environment obligations.
8. Compile clarifying questions for Development/Project Director, Asset/Facilities, and Finance; list required artefacts.
9. Produce outputs in Section 7; mark ❗assumptions and information gaps.
10. Run Section 9 Quality Control and draft a brief email to the `[TARGET_AUDIENCE]` with leverage and next steps.
**4. Role**
Specific Role: a senior sustainability/green lease counsel.
**5. Audience**
Your output must be tailored for the `[TARGET_AUDIENCE]` specified in the Variables and calibrated to the `[CLIENT_ROLE]`, `[RISK_APPETITE]`, and `[NEGOTIATION_POSITION]`.
**6. Context**
Use `[FACTUAL_BACKGROUND]`, `[KEY_LEGAL_TEXT]`, `[RELATED_SCHEDULES]`, `[LINKED_AGREEMENTS]`, and `[REFERENCE_POLICIES]` as primary context. Align with `[REGULATORY_FRAMEWORK]`.
**7. Output Format**
* **Style Guide:**
Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/
* **Format:** Deliver a complete review pack for the Green Lease Addendum consisting of: (1) an executive summary (≤10 bullets); (2) a risk heat-map (RAG) by `[KEY_CONCERNS]`; (3) a clause-by-clause comment log with clause references; (4) a negotiation positions table (primary/fallback/walk-away); (5) targeted redline *snippets*; (6) a programme/EOT & notices tracker (SOPA/lien calendar where relevant); (7) a handover & defects checklist (O&M, warranties); and (8) a short email to the `[TARGET_AUDIENCE]`.
**8. Guardrails**
Focus strictly on legal/contract/compliance risk-no engineering design, cost estimating or construction means/methods. Do **not** rewrite entire clauses; provide targeted bullet recommendations and optional redline *snippets*. Flag high-risk items: unclear design responsibility, EOT/notice traps, penalty LDs, unilateral variations, broad latent condition exclusions, SOPA/lien non-compliance, weak security/insurance, cladding/fire risks, onerous make-good, and over-restrictive assignment/subletting. If inputs are incomplete, state assumptions and take a conservative, defensible position.
**9. Quality Control**
Verify design responsibility and approvals; confirm programme/EOT triggers and notice windows; check LD rates/caps vs penalties; validate variation/change workflow; confirm latent condition and access/service risk allocation; check SOPA/lien processes; verify security/retention/bonds/parent guarantees; confirm insurance lines/endorsements/limits; validate testing/commissioning/completion/defects regime and warranty assignments; check rent review/incentives/outgoings mechanics; ensure make-good scope is clear and fair; confirm safety/WHS-CDM and environmental obligations; verify schedules/exhibits completeness `[EXHIBITS]`.
JavaScript is disabled. Select all text in the box and copy it manually.
________________________________
Suggested Follow-Up Prompts
- Draft redline snippets for the highest-risk clauses in the Green Lease Addendum.
- Prepare an EOT/LD risk model and notice calendar for the Green Lease Addendum.
- Create a latent conditions/site access evidence pack request list for the Green Lease Addendum.
- Build a rent review/incentives and outgoings calculator for the Green Lease Addendum.
- Generate a defects/DLP and warranties assignment checklist for the Green Lease Addendum.
Tips for This Prompt
- Paste real clause extracts/redlines into `[KEY_LEGAL_TEXT]` for precise comments.
- Limit `[KEY_CONCERNS]` to the top 3–5 to sharpen negotiation focus.
- Attach drawings/specs, programme, rent schedules, security/insurance evidence and BIM protocols in `[RELATED_SCHEDULES]`.