Extension of Time (EOT) Claim Builder – Construction

Assemble a compliant and persuasive EOT notice and claim, aligned to your contract’s notice regime and the project’s critical path analysis.

Fill in all the bracketed [PLACEHOLDER] information in the variables section.


**1. Task**

Draft a compliant EOT notice and claim pack that identifies the qualifying delay events, demonstrates causation to the critical path, quantifies time impact, and preserves cost rights where allowed.

**2. Variables (User Input)**

– [JURISDICTION]: (e.g., NSW, VIC, QLD, WA, SA, NT, TAS, ACT, England & Wales, Singapore, UAE, etc.)
– [CONTRACT_FORM]: (e.g., AS 4000-1997, AS 4902-2000, AS 2124-1992, GC21, FIDIC Red, NEC4, bespoke)
– [FACTUAL_BACKGROUND]: (short, bullet summary of the project, parties, scopes, and timeline)
– [KEY_LEGAL_TEXT]: (paste relevant contract clauses, schedules, annexures, special conditions)
– [EVIDENCE_SET]: (programs, notices, emails, meeting minutes, site diaries, photos)
– [TARGET_AUDIENCE]: (e.g., Client CEO, Project Director, Superintendent, Counsel, Adjudicator)
– [DESIRED_TONE]: (e.g., formal, assertive, neutral, conciliatory)
– [DESIRED_READING_LEVEL]: (e.g., plain English, Year 10, Board-ready)
– [CLIENT_ROLE]: (e.g., Principal, Head Contractor, Subcontractor, Superintendent)
– [KEY_CONCERNS]: (list 3–5 focus areas relevant to this task)
– [DELAY_EVENTS]: (list each event with start/finish dates, cause, and relevance to contract EOT events)
– [NOTICE_DATES]: (dates any notices were or will be given)
– [PROGRAM_DATA]: (as‑planned, as‑built, updates, time‑location charts)
– [CONCURRENCY_POSITION]: (approach required by the contract/law)
– [COST_COMPONENTS]: (prolongation, prelims, financing, head office, disruption)
– [SUPERINTENDENT_DETAILS]: (name, email, address)

**3. Process**

1. Confirm the [CLIENT_ROLE] and the notice regime under the [CONTRACT_FORM] and [JURISDICTION].
2. Match each item in [DELAY_EVENTS] to the contract EOT events and any prerequisites (e.g., notices within X days).
3. Test causation: identify the impacted critical path activities using [PROGRAM_DATA]; state method (TIA, Windows, As‑Built vs As‑Planned).
4. Address [CONCURRENCY_POSITION] explicitly and explain treatment of concurrent or overlapping delays.
5. Calculate time entitlement and any float consumption rules under the [CONTRACT_FORM].
6. Preserve cost entitlement if available: link to [COST_COMPONENTS] and contractual preconditions.
7. Draft a formal EOT notice to [SUPERINTENDENT_DETAILS] with reservation of rights.
8. Compile a supporting schedule: Event | Clause | Facts | Notices Given | Time Impact (days) | Cost Impact (if applicable) | Evidence References.
9. Propose a follow‑up program update submission protocol (file format, data date, narrative).

**4. Role**

Specific Role: Construction delay claims lawyer experienced in forensic planning and contract EOT regimes.

**5. Audience**

Your output must be tailored for the [TARGET_AUDIENCE] (e.g., Superintendent, Adjudicator, or Client Executive).

**6. Context**

Apply the [FACTUAL_BACKGROUND], [KEY_LEGAL_TEXT], [PROGRAM_DATA], and [JURISDICTION] to ensure the claim is contract‑specific and evidentially grounded.

**7. Output Format**

* **Style Guide:**

Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/

* **Format:** Deliver: (1) a formal EOT notice letter; (2) a claims schedule table as described; (3) a short narrative (≤400 words) explaining method and concurrency handling; (4) a checklist of next steps and deadlines.

**8. Guardrails**

– Do not change the baseline programme-only explain the analysis method.
– Avoid argumentative tone in the letter; be factual and courteous.
– Do not include raw native schedule files-list them in an evidence index.
– Only claim costs if the contract allows and prerequisites are met.

**9. Quality Control**

– Confirm each delay event cites the correct clause and notice date.
– Check time calculations add correctly and that days are calendar vs working per contract.
– Ensure concurrency treatment matches the [CONTRACT_FORM]/[JURISDICTION] approach.
– Verify the letter addresses the correct recipient details and includes reservation wording.


JavaScript is disabled. Select all text in the box and copy it manually.

________________________________

Suggested Follow-Up Prompts

– Create a program narrative comparing the affected windows with snapshots.
– Draft a response to an anticipated partial EOT award, preserving cost claims.
– Prepare an adjudication‑ready EOT submission outline.

Tips for This Prompt

– Include a visual of the affected path in your evidence pack.
– Note whether float is owned by the project or the contractor per the contract.
– Keep the notice and claim as separate documents if the contract requires.