Concurrent Delay – Position Paper Builder

State your concurrency approach clearly and apply it to the project facts to drive consistent EOT and cost outcomes.

Fill in all the bracketed [PLACEHOLDER] information in the variables section.


**1. Task**

Draft a concurrency position paper applying the contract/jurisdictional approach to identified overlapping delays.

**2. Variables (User Input)**

– [JURISDICTION]: (e.g., NSW, VIC, QLD, WA, SA, NT, TAS, ACT, England & Wales, Singapore, UAE, etc.)
– [CONTRACT_FORM]: (e.g., AS 4000-1997, AS 4902-2000, AS 2124-1992, GC21, FIDIC, NEC4, bespoke)
– [FACTUAL_BACKGROUND]: (bullet summary: project, parties, scopes, timeline)
– [KEY_LEGAL_TEXT]: (paste relevant contract clauses/schedules/special conditions)
– [EVIDENCE_SET]: (programs, notices, emails, site diaries, photos, minutes)
– [TARGET_AUDIENCE]: (e.g., Board, Project Director, Superintendent, Counsel, Adjudicator)
– [DESIRED_TONE]: (e.g., formal, assertive, neutral, conciliatory)
– [DESIRED_READING_LEVEL]: (e.g., plain English, Board-ready)
– [CLIENT_ROLE]: (e.g., Principal, Head Contractor, Subcontractor, Superintendent)
– [KEY_CONCERNS]: (list 3–5 focus areas relevant to this task)
– [CONCURRENCY_TEST]: (dominant cause, apportionment, Malmaison-type, contract-specific rule)
– [DELAY_WINDOWS]: (time slices with overlapping causes)
– [COST_TREATMENT]: (prolongation and LD interaction)

**3. Process**

1. Confirm [CONCURRENCY_TEST] required by [CONTRACT_FORM]/[JURISDICTION].
2. Define each window in [DELAY_WINDOWS] with causes and effects.
3. Apply the test to time entitlement and [COST_TREATMENT].
4. Summarise outcomes and examples for consistent future decisions.
5. Draft standard wording for future EOT/claim submissions.

**4. Role**

Specific Role: Construction delay lawyer coordinating with planners.

**5. Audience**

For the [TARGET_AUDIENCE] (adjudicator/certifier/executives).

**6. Context**

Use [FACTUAL_BACKGROUND], [PROGRAM_DATA], [KEY_LEGAL_TEXT], [DELAY_WINDOWS].

**7. Output Format**

* **Style Guide:**

Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/

* **Format:** Provide (A) a concurrency policy note; (B) a worked example table; (C) standard submission wording; (D) a risk note on disputes.

**8. Guardrails**

– Do not change the baseline program; apply analysis only.
– Avoid mixing legal tests across jurisdictions.
– State assumptions and evidence limits clearly.

**9. Quality Control**

– Check each window’s causes are evidenced.
– Ensure policy wording matches the test selected.
– Verify LD interactions are consistent with outcomes.


JavaScript is disabled. Select all text in the box and copy it manually.

________________________________

Suggested Follow-Up Prompts

– Prepare a training note for the project team on concurrency.
– Draft an adjudication submission section on concurrency.
– Create a correspondence template responding to concurrency arguments.

Tips for This Prompt

– Keep diagrams of overlapping bars for clarity.
– Use the same terminology across all documents.
– Record float ownership assumptions explicitly.