SMR (Small Modular Reactor) Long-Lead & EPC Pre-Contract

Get SMR supply chains moving with bankable pre-contracts.

Fill in all the bracketed [PLACEHOLDER] information in the variables section.

<!– CLICK-TO-COPY BOX: keep this structure exactly; replace only the placeholders inside the with final content. -->

**1. Task**

Prepare SMR long-lead/EPC pre-contract: licensing dependencies, nuclear QA (ASME/ISO), IP ownership, change control, and LDs for delay.

**2. Variables (User Input)**

- [JURISDICTION]: Primary jurisdiction(s) governing the matter.
- [CLIENT_ROLE]: Your client’s role (e.g., Buyer/Seller, Owner/Contractor, Operator/Non-Operator).
- [TARGET_AUDIENCE]: Who will read the output (e.g., Partner, Client GC, Lenders).
- [DESIRED_TONE]: e.g., Crisp/Board-ready, Detailed/Technical, Neutral.
- [DESIRED_READING_LEVEL]: e.g., Senior associate / GC / Board.
- [FACTUAL_BACKGROUND]: Concise 5–10 bullet summary of the facts and project.
- [KEY_LEGAL_TEXT]: Paste the relevant clauses/excerpts or attach references.
- [KEY_CONCERNS]: List 3–5 focus areas for this task.
- [RISK_TOLERANCE]: Low/Medium/High with any non-negotiables.
- [DEAL_SIZE]: Headline sizes/volumes/capacity where relevant.
- [COUNTERPARTY]: Names and any known risk markers.
- [GOVERNING_LAW]: Contract governing law (if different).
- [APPLICABLE_STANDARDS]: Technical/market standards or grid codes.
- [SOURCE_DOCUMENT_TYPE]: e.g., Term Sheet, Long-form, Model form.
- [PROJECT_STAGE]: e.g., Development/Construction/Operations/Closure.
- [ENERGY_TECHNOLOGY]: e.g., Wind/Solar/BESS/Hydrogen/CCS/LNG/Mining/Geothermal/Nuclear.
- [COMMODITY]: e.g., Electricity/Gas/LNG/Hydrogen/Ammonia/Lithium/Iron Ore/SAF/HVO/Certificates/Carbon/Uranium.
- [CONTRACT_COUNTERPARTIES]: List entities and their roles.
- [CROSS_REFERENCES]: Other linked documents to check for alignment.
- [DEADLINE]: Output deadline and time zone.

**3. Process**

1) Confirm `[CLIENT_ROLE]`, `[JURISDICTION]`, `[TARGET_AUDIENCE]`, `[RISK_TOLERANCE]`, and `[DEADLINE]`.
2) Read the `[FACTUAL_BACKGROUND]` and catalogue assumptions or missing data.
3) Parse `[KEY_LEGAL_TEXT]` and identify provisions linked to `[KEY_CONCERNS]` and `[APPLICABLE_STANDARDS]`.
4) Build a clause inventory: definition references, cross-references, schedules, and exhibits.
5) For each `[KEY_CONCERNS]` item, extract the controlling clause text and summarise the operative effect.
6) Assess legal risk (Likelihood x Impact) with a RAG rating and note evidentiary requirements.
7) Identify negotiation levers and propose `[CLIENT_ROLE]`-aligned positions and fallbacks.
8) Draft precise bullet-level edits (do not rewrite whole clauses) with rationale and citation to `[JURISDICTION]` or `[APPLICABLE_STANDARDS]` where relevant.
9) Check consistency across `[CROSS_REFERENCES]` (e.g., PPA ↔ Connection Agreement ↔ O&M).
10) Run scenario tests (best/base/worst) and quantify exposure using `[DEAL_SIZE]` metrics if available.
11) Flag counterparties’ likely objections (based on `[SOURCE_DOCUMENT_TYPE]` and market practice) and prepare responses.
12) Verify defined terms, measurement points, time bars, and notice mechanics.
13) Map data/cyber, HSE, environment, tax, and financing interfaces and align with `[GOVERNING_LAW]`.
14) Produce a Negotiation Playbook with opening, target, and fallback positions; include concession trades.
15) Create a concise Executive Summary for the `[TARGET_AUDIENCE]` with actionable next steps.
16) List assumptions, open questions, and a data/approvals checklist to close gaps.

**4. Role**

Specific Role: Nuclear projects/EPC counsel.

**5. Audience**

Your output must be tailored for the `[TARGET_AUDIENCE]` specified in the Variables. Write with the `[DESIRED_TONE]` and at the `[DESIRED_READING_LEVEL]`. Position recommendations to advance the goals of the `[CLIENT_ROLE]`.

**6. Context**

Use the `[FACTUAL_BACKGROUND]`, `[CROSS_REFERENCES]`, and `[APPLICABLE_STANDARDS]` to ground your analysis. Assume incomplete data; explicitly state assumptions and request clarifications if critical gaps exist.

**7. Output Format**

* **Style Guide:**

Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/

* **Format:** Deliver dependency register, QA/traceability requirements, and regulator interface plan.

**8. Guardrails**

- Focus only on legal and contractual risks; do not give business, tax, or pricing advice.
- Cite to `[JURISDICTION]` sources in general terms only; do not state or imply you are giving regulated legal advice.
- Do not invent facts; where data is absent, present options and assumptions clearly.
- Do not rewrite entire clauses; propose bullet-level edits and negotiation levers.
- Keep recommendations consistent with `[CLIENT_ROLE]` and `[RISK_TOLERANCE]`.
- Flag any dependencies on `[CROSS_REFERENCES]` and required third-party consents.
- Avoid confidential information and anonymise counterparties unless provided.
- Call out areas requiring specialist input (regulatory, tax, technical, insurance).
- Emphasise nuclear-grade QA, export controls, and site licence milestones.

**9. Quality Control**

- Verify all defined terms are used consistently and cross-references are correct.
- Double-check notice requirements, time bars, and cure periods for each recommendation.
- Stress-test proposed positions against plausible counter-positions and document fallbacks.
- Perform a change-in-law and standards alignment check for `[JURISDICTION]`.
- Validate maths in any examples (indexation, LDs, ToP) and roundings.
- Ensure the Executive Summary matches the detailed analysis and flags any open issues.
- Confirm the output structure matches the requested `Format` exactly.

JavaScript is disabled. Select all text in the box and copy it manually.

________________________________

Suggested Follow-Up Prompts

– Prepare a two-page IC memo setting out the highest-impact decisions for the Prepare SMR long-lead/EPC pre-contract.
– Draft a negotiation script and fallback matrix for the Prepare SMR long-lead/EPC pre-contract top 5 issues.
– Create counterpart-ready bullet edits for the Prepare SMR long-lead/EPC pre-contract ‘red flag’ clauses.
– Run best/base/worst scenarios for the Prepare SMR long-lead/EPC pre-contract, showing exposure by `[DEAL_SIZE]` metrics.
– Generate a diligence request list to close gaps identified in the Prepare SMR long-lead/EPC pre-contract.

Tips for This Prompt

– Paste the operative clause text into `[KEY_LEGAL_TEXT]` so the analysis can quote precisely.
– State any non-negotiables in `[RISK_TOLERANCE]` to guide the playbook.
– Include key linked documents in `[CROSS_REFERENCES]` to avoid misalignment.

Next