Risk Register Build (Board-Facing): Draft

Build a legal/compliance risk register tailored for the NFP, mapped to owners and controls.

Fill in all the bracketed [PLACEHOLDER] information in the variables section.

<!– CLICK-TO-COPY BOX: keep this structure exactly; replace only the placeholders inside the with final content. -->


**1. Task**

Prepare a comprehensive draft pack for **Risk Register Build (Board-Facing): Draft** in `[JURISDICTION]`, optimised for the not‑for‑profit context and the client’s position as `[CLIENT_ROLE]`. Use `[FACTUAL_BACKGROUND]`, `[KEY_LEGAL_TEXT]`, and the `[KEY_CONCERNS]` to drive priorities and output tailored to the `[TARGET_AUDIENCE]`.

**2. Variables (User Input)**

- [JURISDICTION]:
- [CLIENT_ROLE]: (e.g., "Charity", "Foundation", "Peak Body", "Social Enterprise Arm")
- [FACTUAL_BACKGROUND]: (short brief of the situation, parties, dates, funding sources)
- [KEY_LEGAL_TEXT]: (paste the relevant contract/policy/draft or leave blank if drafting from scratch)
- [TARGET_AUDIENCE]: (e.g., "Board", "Executive Team", "Frontline Staff", "Donors")
- [DESIRED_TONE]: (e.g., "Plain-English", "Formal", "Negotiation-Ready", "Board Pack")
- [DESIRED_READING_LEVEL]: (e.g., Grade 8–10 for board packs)
- [KEY_CONCERNS]: (3–5 bullet issues-for example: conflicts, indemnity scope, privacy, safeguarding, grant compliance)
- [RISK_CATEGORIES]:
- [CURRENT_CONTROLS]:
- [RISK_APPETITE]:
- [REPORTING_CADENCE]:
- [INCIDENT_HISTORY]:

**3. Process**

1. Define risk categories and appetite.
2. Identify inherent vs residual risk per area.
3. Map current controls and gaps.
4. Assign owners and review cadence.
5. Provide suggested improvements and KPIs.
6. Create heat maps and summary dashboards.
7. Draft board reporting templates.
8. Provide assurance/testing suggestions.
9. Add incident capture mechanisms.
10. Set a quarterly review agenda.

**4. Role**

Specific Role: Risk and governance counsel translating legal risks into board‑level views.

**5. Audience**

Tailor all explanations, summaries, and recommendations for the `[TARGET_AUDIENCE]` and ensure readability at the `[DESIRED_READING_LEVEL]` while maintaining the `[DESIRED_TONE]`. Where the audience includes lay board members, provide plain-language summaries alongside technical notes.

**6. Context**

Use the facts in `[FACTUAL_BACKGROUND]`, the client's position as `[CLIENT_ROLE]`, and any supplied documents in `[KEY_LEGAL_TEXT]` to anchor the analysis. Explicitly reference how each recommendation addresses the `[KEY_CONCERNS]`.

**7. Output Format**

* **Style Guide:**

Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/

* **Format:** Provide the following deliverables in order, using clear headings, tables where helpful, and numbered lists for action items.


- Risk Register (table).
- Heat Map & Dashboard.
- Improvement Plan.
- Board Reporting Templates.

**8. Guardrails**

- Focus strictly on legal/compliance issues relevant to not-for-profit entities-no business, fundraising strategy, or pricing advice.
- Do not fabricate legal authorities; if uncertain, state the uncertainty and suggest verification.
- Do not provide jurisdiction-agnostic conclusions; tie analysis to `[JURISDICTION]` or flag where general principles are used.
- Do not rewrite entire clauses unless expressly instructed-present bullet-point recommendations, example wording, or redlines.
- Do not include personal data; use placeholders and anonymise as needed.
- Maintain neutrality; disclose assumptions and constraints from `[FACTUAL_BACKGROUND]` and `[KEY_LEGAL_TEXT]`.
- Escalate issues that may require specialist counsel (e.g., tax concessions, AML/CTF, safeguarding).

**9. Quality Control**

- Verify all references to the `[JURISDICTION]` legal framework are accurate and current.
- Cross-check each recommendation against the `[KEY_CONCERNS]` list; do not omit any.
- Flag any ambiguous or missing facts from `[FACTUAL_BACKGROUND]` as assumptions.
- Test the output against the `[TARGET_AUDIENCE]` and `[DESIRED_READING_LEVEL]` requirements; simplify where possible.
- Provide a short change-log of drafting decisions and risk ratings (Low/Medium/High) for each.
- If statutes or regulations are cited, include the full citation and a 1–2 line relevance note.
- Run a final pass to ensure no business, pricing, or operational advice is given-legal and compliance only.
- Ensure the final deliverables are internally consistent (definitions, parties, dates) and free of contradictions.
- Where alternative approaches exist, list at least one fallback option with pros/cons.


JavaScript is disabled. Select all text in the box and copy it manually.

________________________________

Suggested Follow-Up Prompts

– Localise the outputs from ‘Risk Register Build (Board-Facing): Draft’ for another `[JURISDICTION]`.
– Create a one‑page board summary of ‘Risk Register Build (Board-Facing): Draft’ outputs.
– Draft an internal communications plan to roll out ‘Risk Register Build (Board-Facing): Draft’.

Tips for This Prompt

– Use examples and tables to enhance clarity.
– Note any assumptions explicitly and list what evidence would firm them up.
– Tie actions to owners and due dates for accountability.

Next