Align crash facts with design/maintenance standards and notice to pursue public or contractor liability.
Fill in all the bracketed [PLACEHOLDER] information in the variables section.
<!– CLICK-TO-COPY BOX: keep this structure exactly; replace only the placeholders inside the with final content. -->
Copy Legal Prompt
**1. Task**
Develop a road design/maintenance claim plan using `[FACTUAL_BACKGROUND]`, `[KEY_LEGAL_TEXT]` (manuals/standards/statutes), `[JURISDICTION]`, `[CLIENT_ROLE]`, and `[KEY_CONCERNS]`.
**2. Variables (User Input)**
[JURISDICTION]: Specify the governing law and forum (state/territory/country).
[FACTUAL_BACKGROUND]: Bullet summary of key facts (who/what/when/where/how).
[KEY_LEGAL_TEXT]: Paste any relevant statutes, regulations, rules, standards, policies, pleadings, or draft text to analyse.
[TARGET_AUDIENCE]: e.g., claims adjuster, opposing counsel, mediator, judge, client.
[DESIRED_TONE]: e.g., professional, assertive, neutral, empathetic.
[DESIRED_READING_LEVEL]: e.g., Plain English, Year 10, legal practitioner.
[CLIENT_ROLE]: e.g., Plaintiff, Defendant, Insured, Claimant.
[KEY_CONCERNS]: 3–5 focus areas for this task (e.g., liability, causation, damages, coverage, timing).
[DEFECT_DESCRIPTION]: Sight lines, signage, guardrails, potholes.
[MAINTENANCE_HISTORY]: Work orders, inspections, complaints.
[CONTRACTORS]: Designers/maintainers and contracts.
**3. Process**
1. Identify applicable standards and immunity exceptions.
2. Map facts to duty/breach (design vs maintenance).
3. Establish notice and causation links with `[MAINTENANCE_HISTORY]`.
4. Plan discovery of plans/as‑builts and contractor roles.
5. Address caps/immunity and pre‑suit notice requirements.
**4. Role**
Specific Role: Public‑entity/contractor PI litigator cross‑walking standards to facts.
**5. Audience**
Tailor the output to the `[TARGET_AUDIENCE]` using the `[DESIRED_TONE]` and `[DESIRED_READING_LEVEL]` provided.
**6. Context**
Apply `[FACTUAL_BACKGROUND]`, authorities in `[KEY_LEGAL_TEXT]`, and forum norms in `[JURISDICTION]`. Maintain posture aligned to `[CLIENT_ROLE]`. Prioritise `[KEY_CONCERNS]`.
**7. Output Format**
* **Style Guide:**
Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/
* **Format:**
* Provide a standards/evidence matrix, notice checklist, and pleadings starters.
**8. Guardrails**
- Focus only on legal/strategic issues; do not give medical, business, or pricing advice.
- Do not fabricate facts or citations. If information is missing, state conservative assumptions explicitly.
- Avoid naming real individuals/companies unless provided in the Variables.
- Tie analysis to `[JURISDICTION]`; avoid generic conclusions.
- Provide concise, actionable recommendations rather than rewriting entire documents unless requested.
- Do not assume waiver of immunity; verify statutory predicates.
**9. Quality Control**
- Verify dates, names, and figures against `[FACTUAL_BACKGROUND]`.
- Check compliance with rules and standards cited in `[KEY_LEGAL_TEXT]`.
- Ensure recommendations align with `[CLIENT_ROLE]` and `[KEY_CONCERNS]`.
- Flag missing inputs that could materially change conclusions.
- Check statute of repose for design claims.
JavaScript is disabled. Select all text in the box and copy it manually.
________________________________
Suggested Follow-Up Prompts
– Draft a notice of claim to the road authority.
– Create subpoenas for plans/as‑builts and maintenance logs.
– Generate a mediation brief addressing caps and risk.
Tips for This Prompt
– Site inspections at the same light/weather conditions help.
– Check adjacent crash history for foreseeability.
– Coordinate with a traffic engineer early.