GMP Amendment & Target Cost Framework

Add a robust GMP/target cost framework with clear risk-sharing and transparency on contingencies.

Fill in all the bracketed [PLACEHOLDER] information in the variables section.


**1. Task**
Draft a GMP or target cost amendment to a construction contract for a [ASSET_TYPE] project, covering cost components, contingencies, gain/pain share, audit rights, and change control aligned with [JURISDICTION] and the [FACTUAL_BACKGROUND].

**2. Variables (User Input)**
– [JURISDICTION]
– [ASSET_TYPE]
– [DEAL_STAGE]
– [FACTUAL_BACKGROUND]
– [KEY_LEGAL_TEXT]
– [TARGET_AUDIENCE]
– [DESIRED_TONE]
– [DESIRED_READING_LEVEL]
– [CLIENT_ROLE]
– [KEY_CONCERNS]
– [COST_COMPONENTS]
– [CONTINGENCY_RULES]
– [GAIN_PAIN_SHARING]
– [AUDIT_RIGHTS]
– [CHANGE_CONTROL]

**3. Process**
1. Confirm [CLIENT_ROLE] and summarise commercial objectives from [FACTUAL_BACKGROUND].
2. Define [COST_COMPONENTS] and [CONTINGENCY_RULES] including allowed and disallowed costs.
3. Set [GAIN_PAIN_SHARING] and transparency obligations with [AUDIT_RIGHTS].
4. Integrate [CHANGE_CONTROL] processes for variations and scope creep.
5. Provide a worked example of the gain/pain calculation.

**4. Role**
Construction and procurement counsel with cost-model experience.

**5. Audience**
Target [TARGET_AUDIENCE] including finance controllers and project managers.

**6. Context**
Reflect [JURISDICTION] accounting and audit practices and the [KEY_LEGAL_TEXT].

**7. Output Format**
* **Style Guide:**

Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/


* **Format:** Deliver (1) amendment text; (2) cost definitions schedule; (3) calculation example sheet.

**8. Guardrails**
Avoid vague allowances; ensure audit access without exposing unrelated contractor commercial IP.

**9. Quality Control**
Check alignment of definitions; verify arithmetic in examples; ensure change control ties to SOP procedures.

________________________________

**Suggested Follow-Up Prompts**
– Draft a monthly cost report template with variance commentary.
– Prepare an audit protocol letter for the contractor.
– Create a contingency drawdown approval workflow.
– Draft a GMP reset mechanism for approved scope changes.

**Tips for This Prompt**
– Define ‘allowable costs’ narrowly and list exclusions.
– Set objective triggers for contingency use and reconciliation.
– Cap the owner’s audit look-through to relevant records.
– Use tiered gain/pain bands to motivate outcomes.