Energy Performance Contract (EPC) – Savings, M&V & Guarantees Review

Surface hidden traps in your Energy Performance Contract (EPC). Performance guarantees and metering turn on the fine print. Do this review once, capture the leverage, so safety, insurance and SOPA compliance hold up when tested.

Fill in all the bracketed [PLACEHOLDER] information in the variables section.

<!– CLICK-TO-COPY BOX: keep this structure exactly; replace only the *(Author's Note: …)* placeholders inside the with final content. -->


**1. Task**

Conduct a structured legal risk review of the `Energy Performance Contract (EPC)` using the inputs in Section 2. Identify issues, assess impact/likelihood, propose negotiation positions, and prepare a concise executive summary and comment log tailored to the client’s role and risk appetite.

**2. Variables (User Input)**

[JURISDICTION]: (e.g., Australia (SOPA/strata/RE law/WH&S), US (AIA/Mechanics Lien/OSHA), UK (JCT/CDM 2015), EU (FIDIC/Procurement), Singapore (SIA), Middle East (FIDIC/Decennial/CIETAC), Global (FIDIC/NEC/JCT, ISO 19650 BIM), local planning/building codes)
[GOVERNING_LAW]: (if different from [JURISDICTION])
[CLIENT_ROLE]: (e.g., "Owner/Principal", "Developer/Investor", "General Contractor", "Design-Builder", "EPC Contractor", "Subcontractor", "Consultant (Architect/Engineer/QS)", "Facility Manager", "Tenant/Occupier", "Landlord/REIT", "Lender", "Vendor/Supplier")
[TARGET_AUDIENCE]: (e.g., "GC/Head of Legal", "Project Director/PMO", "Head of Development", "Head of Leasing", "Facilities/Operations", "Board/Risk Committee", "Lenders/Investment Committee")
[DESIRED_TONE]: (e.g., "plain-English, commercial", "board-ready concise", "technical legal")
[DESIRED_READING_LEVEL]: (e.g., "Executive", "Undergraduate", "Lawyer-to-lawyer")
[FACTUAL_BACKGROUND]: (project/property; scope; budgets; timetable; procurement route; site risks; stakeholders; approvals)
[DOCUMENT_TYPE]: (agreement under review-paste name/version)
[COUNTERPARTY]: (legal name, identifiers, address)
[PARTIES]: (all parties with identifiers)
[EFFECTIVE_DATE]: (YYYY-MM-DD)
[TERM]: (tenor/renewals; exit/transition)
[TRANSACTION_VALUE]: (price; rent; capex/opex; milestone sums; indexation)
[KEY_LEGAL_TEXT]: (paste the agreement or relevant extracts/redlines)
[RELATED_SCHEDULES]: (scope/specs; BoQ/SoR; programme; drawings; BIM execution plan; insurance certificates; warranties/bonds; O&M manuals; commissioning plans; ESG/green clauses; planning permissions; survey/geotech; contamination reports)
[LINKED_AGREEMENTS]: (e.g., development agreement; funding agreement; consultant appointments; collateral warranties; PCG/performance bonds; subcontracts; supply contracts; building/strata rules; easements; title reports; escrow instructions; D&C novation; FM contracts; energy PPA/lease; data centre MSA/SLA)
[REFERENCE_POLICIES]: (house positions: safety/WH&S; quality; ESG/net zero; modern slavery; procurement; risk allocation; BIM/data standards)
[REGULATORY_FRAMEWORK]: (planning/permits; building codes; safety/WH&S/OSHA; security of payment/SOPA; mechanics liens; decennial liability; CDM; accessibility; fire safety; energy/performance standards; environmental/protection; strata/HOA; landlord-tenant law)
[RISK_APPETITE]: ("low", "moderate", "high")
[KEY_CONCERNS]: (3–5 focus areas; e.g., Scope/Design Responsibility, Programme/EOT & LDs, Variations/Change Control, Payment/Retention/Security of Payment, Risk Allocation & Indemnities, Insurance & Bonds, HSE/WH&S, Quality/Defects/Warranties, Title/Encumbrances, Landlord/Tenant Risks, ESG/Green Clauses, BIM/IP/Data, Latent Conditions/Contamination, Disputes/Adjudication, Step-in/Termination)
[NEGOTIATION_POSITION]: ("client-friendly", "balanced", "counterparty-friendly")
[DEAL_TIMELINE]: (planning; procurement; construction; PC; handover; DLP; long-stop)
[SITE_CONDITIONS_AND LATENT_RISKS]: (geotech; contamination; utilities; access)
[DESIGN_RESPONSIBILITY_AND APPROVALS]: (design freeze; approvals; novations)
[PROGRAMME_EOT_AND LDs]: (critical path; float; caps)
[VARIATION_AND CHANGE_ORDERS]: (process; margins; thresholds)
[PAYMENT_MILESTONES_AND SRA]: (valuations; retention; security; audit)
[HSE_AND WHS]: (controls; permits; inductions; safety plans)
[QUALITY_AND COMMISSIONING]: (QA/QC; testing/commissioning; O&M; defects)
[INSURANCE_AND SURETY]: (CAR; PL; PI; decennial; bonds; PCG)
[PROPERTY_TITLE_AND DUE_DILIGENCE]: (title; encumbrances; easements; surveys)
[LEASING_ECONOMICS_AND OPEX]: (base rent; OPEX/NAV; caps; incentives; make-good)
[GREEN_LEASE_AND ESG]: (energy/water; disclosure; ratings; obligations)
[BIM_IP_AND DATA]: (ISO 19650; LOD; data ownership/licences)
[DISPUTE_RESOLUTION_AND SOPA]: (adjudication; DAB; arbitration; litigation)
[QUESTIONS_FOR_CLIENT]: (open points needing instruction)
[EXHIBITS]: (attachments the output should reference)
[SAVINGS_GUARANTEES_AND BASELINES]: (method)
[M&V_PROTOCOLS_AND DISPUTES]: (rules)
[REMEDIES_AND SHARING]: (mechanics)

**3. Process**

1. Confirm `[CLIENT_ROLE]`, `[JURISDICTION]`/`[GOVERNING_LAW]`, `[RISK_APPETITE]` and `[NEGOTIATION_POSITION]`; identify procurement route (e.g., D&C, EPC, DB, CM, NEC, JCT, FIDIC) and security of payment/lien regime.
2. Parse `[KEY_LEGAL_TEXT]`, `[RELATED_SCHEDULES]` and `[LINKED_AGREEMENTS]`; map clauses to `[KEY_CONCERNS]` and operational mechanics: scope/design, programme/EOT/LDs, variations/change control, payment/retention, risk/indemnities/insurance/bonds/PCG, HSE/quality/defects, title/land, leasing economics/OPEX/make-good, BIM/IP/data, ESG/green clauses, latent conditions/contamination, dispute regime.
3. Extract commercial/legal mechanics: caps/LDs; EOT triggers; risk share (pain/gain/GMP/target cost); variation pricing; SoR rates; payment certification; retention release; security of payment compliance; mechanics lien flowdowns; design responsibility and novations; commissioning/practical completion/defects liability; collateral warranties; step-in/termination and transition.
4. Benchmark against `[REGULATORY_FRAMEWORK]` and `[REFERENCE_POLICIES]`; note deviations and hotspots.
5. For each `[KEY_CONCERNS]` area, assess exposure and propose primary/fallback/walk-away positions with rationale.
6. Validate insurance/bonds (CAR/PL/PI/decennial), PCG forms, and title/encumbrance remedies; check ESG/energy clauses, BIM/IP/data ownership/licences and confidentiality.
7. Identify drafting defects: vague scope/design responsibility, unlimited LDs, float ownership gaps, unilateral variation rights, pay-when-paid violations, inadequate retention/bond release, weak HSE/quality, silent latent conditions, missing collateral warranties, unclear make-good, one-sided termination.
8. Compile clarifying questions for PMO/cost/QS/design/FM/leasing/ESG teams and list permits/licences, surveys and tests needed.
9. Produce outputs in Section 7; mark ❗assumptions and information gaps.
10. Run Section 9 Quality Control and draft a brief email to the `[TARGET_AUDIENCE]` with leverage and next steps.

**4. Role**

Specific Role: a senior energy efficiency/real estate counsel.

**5. Audience**

Your output must be tailored for the `[TARGET_AUDIENCE]` specified in the Variables and calibrated to the `[CLIENT_ROLE]`, `[RISK_APPETITE]`, and `[NEGOTIATION_POSITION]`.

**6. Context**

Use `[FACTUAL_BACKGROUND]`, `[KEY_LEGAL_TEXT]`, `[RELATED_SCHEDULES]`, `[LINKED_AGREEMENTS]`, and `[REFERENCE_POLICIES]` as primary context. Align with `[REGULATORY_FRAMEWORK]`.

**7. Output Format**

* **Style Guide:**

Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/

* **Format:** Deliver a complete review pack for the Energy Performance Contract (EPC) consisting of: (1) an executive summary (10 bullets max); (2) a risk heat-map (RAG) by `[KEY_CONCERNS]`; (3) a clause-by-clause comment log with clause references; (4) a negotiation positions table (primary/fallback/walk-away); (5) targeted redline *snippets*; and (6) a short email to the `[TARGET_AUDIENCE]`.

**8. Guardrails**

Focus strictly on legal/contract/compliance risk-no structural engineering or quantity surveying calculations. Do **not** rewrite entire clauses; provide targeted bullet recommendations and optional redline *snippets*. Flag high-risk items: ambiguous design responsibility, unlimited LDs or liability, unilateral change control, unlawful pay-when-paid, weak HSE controls, insufficient insurance/bonds/PCG, unclear latent conditions, inadequate commissioning/defects regime, unclear IP/BIM data rights, and missing security of payment or lien protections. If inputs are incomplete, state assumptions and take a conservative, defensible position.

**9. Quality Control**

Check definitions, hierarchy and cross-references. Validate programme logic, EOT triggers and LD caps vs critical path. Verify change control mechanics and pricing; reconcile SoR/BoQ with scope. Confirm payment certification, retention release and security of payment compliance; check lien waivers and flowdowns. Confirm risk allocation & indemnities; verify insurance classes/limits, bonds and PCGs. Check HSE/quality/commissioning, practical completion and defects liability. Validate title/encumbrances and surveys; confirm easements/access/utilities. For leases, verify rent/OPEX, incentives, make-good and restoration logic; confirm ESG/green clauses. Verify BIM/IP/data ownership/licensing and confidentiality. Ensure schedules/exhibits completeness `[EXHIBITS]` (programme, specs, drawings/BIM, SoR/BoQ, insurance/bonds, collateral warranties, title/escrow, ESG schedules).


JavaScript is disabled. Select all text in the box and copy it manually.

________________________________

Suggested Follow-Up Prompts

  • Prepare a positions matrix comparing the Energy Performance Contract (EPC) against our house playbook (EOT/LDs/change control/payment/retention/insurance).
  • Draft redline snippets for the highest-risk clauses in the Energy Performance Contract (EPC).
  • Create a security of payment/lien compliance checklist keyed to the Energy Performance Contract (EPC).
  • Assemble a commissioning and defects liability closeout checklist for the Energy Performance Contract (EPC).
  • Generate a one-page executive briefing on the Energy Performance Contract (EPC).

Tips for This Prompt

  • Paste real clause extracts/redlines into `[KEY_LEGAL_TEXT]` for precise comments.
  • Limit `[KEY_CONCERNS]` to the top 3–5 to focus the analysis and negotiation.
  • Attach programme, SoR/BoQ, insurance/bonds and title/escrow schedules in `[RELATED_SCHEDULES]` for accurate analysis.

Next