Statement of Work (Software Implementation) – Scope & Acceptance Review

Identify scope creep and acceptance traps in an implementation SOW and align deliverables with the contract.

Fill in all the bracketed [PLACEHOLDER] information in the variables section.


**1. Task**

Assess the SOW for clarity of scope, deliverables, acceptance, dependencies, and change control, optimised for the [CLIENT_ROLE] in [JURISDICTION] and guided by the [KEY_CONCERNS].

**2. Variables (User Input)**

[JURISDICTION]:
[CLIENT_ROLE]:
[FACTUAL_BACKGROUND]:
[KEY_LEGAL_TEXT]:
[TARGET_AUDIENCE]:
[DESIRED_TONE]:
[DESIRED_READING_LEVEL]:
[KEY_CONCERNS]:
[REWRITE_REQUESTED]:
[DELIVERABLES_LIST]:
[MILESTONES_PAYMENT_LINKAGE]:
[CLIENT_DEPENDENCIES]:
[ACCEPTANCE_CRITERIA]:
[CHANGE_CONTROL_PROCESS]:

**3. Process**

1. Confirm the [CLIENT_ROLE] and restate the primary objectives derived from [FACTUAL_BACKGROUND] and [KEY_CONCERNS].
2. Identify the governing law and jurisdiction in the [KEY_LEGAL_TEXT]; if absent, flag as missing.
3. Extract all clause headings and numbers to create a review map.
4. Read the [KEY_LEGAL_TEXT] end-to-end once to understand context, defined terms, and structure.
5. Scan for clauses aligned with [KEY_CONCERNS]; tag each occurrence.
6. For each tagged clause, summarise the effect in one sentence, then analyse risks for the [CLIENT_ROLE].
7. Evaluate liability allocation (caps, exclusions, carve-outs) and termination triggers.
8. Check IP ownership/licence scope, assignment restrictions, and change-of-control implications.
9. Assess confidentiality, privacy/data handling and security obligations referencing [JURISDICTION] requirements.
10. Check payment/consideration, invoicing, interest, set-off, and price change mechanics.
11. Check performance obligations: timelines, acceptance, milestones, service levels, credits/penalties.
12. Test boilerplate: notices, variation, waiver, severability, entire agreement, force majeure, assignment, subcontracting.
13. Identify missing or misaligned clauses for the document type; suggest inserts.
14. Prepare negotiation levers and fallback positions aligned to [CLIENT_ROLE].
15. Produce a structured output per Section 7 with a concise Executive Summary.
16. Map deliverables and [DELIVERABLES_LIST] to acceptance criteria and test cases.
17. Verify [MILESTONES_PAYMENT_LINKAGE] and holdbacks align with risk and effort.
18. Clarify [CLIENT_DEPENDENCIES] and assumptions; ensure delays link to extensions only where fair.
19. Evaluate [ACCEPTANCE_CRITERIA], re‑test rights, deemed acceptance, and defect severities.
20. Confirm [CHANGE_CONTROL_PROCESS] is practical and captures scope creep controls.

**4. Role**

Act as a senior IT projects lawyer specialising in complex implementation SOWs.

**5. Audience**

Tailor advice to the [TARGET_AUDIENCE], centring on the [CLIENT_ROLE] (customer/vendor).

**6. Context**

Use [FACTUAL_BACKGROUND] to understand project criticality, integrations, and resource constraints; review the SOW within the contract suite as [KEY_LEGAL_TEXT].

**7. Output Format**

* **Style Guide:**

Apply the Legal Writing Style guide at https://legalprompts.com/legal-style-writing-guide/

* **Format:** Provide the following sections, strictly in this order and using the exact headings:

– Executive Summary (5 bullet points max).
– Deal/Engagement Snapshot (table with party roles, governing law, term, renewal, charges/price, termination rights, key dates).
– Clause-by-Clause Review (table: Clause No./Heading | Issue | Risk Level (Low/Med/High) | Why It Matters | Recommended Edits (bullets) | Negotiation Levers).
– Missing or Weak Provisions (checklist with rationale).
– Risk Heatmap (textual matrix grouping High/Med/Low).
– Client-Facing Advice Memo (≤ 250 words, tailored to the [TARGET_AUDIENCE]).
– Redline-Ready Suggestions (bullet points; no full clause rewrites unless [REWRITE_REQUESTED]=Yes).
– Open Questions & Assumptions (numbered list).
– Next Steps (prioritised action list with owners).
– SOW Traceability Matrix: deliverable → test → acceptance → payment.

**8. Guardrails**

* Focus on legal and contractual risks; avoid commercial pricing or business strategy advice.
* Do not provide definitive legal conclusions; present reasoned risk assessments and options.
* Use conservative interpretations where ambiguity exists; flag ambiguity explicitly.
* Do not rewrite entire clauses unless [REWRITE_REQUESTED]=Yes; otherwise supply bullet-point edits and sample phrasing only.
* Cite clause numbers and headings from the [KEY_LEGAL_TEXT] where available.
* Assume confidentiality; do not include any sensitive client data beyond what is provided in [FACTUAL_BACKGROUND].
* Flag any potential regulatory/ethical issues tied to [JURISDICTION].
* If information is missing, state the assumption and continue with the best available analysis.
* Avoid project management methodology debates; focus on contractual mechanics and risk.

**9. Quality Control**

* Verify definitions and cross-references align across the document.
* Check that mandatory statutory notices/boilerplate for [JURISDICTION] are present.
* Ensure positions are consistent with the [CLIENT_ROLE] and [KEY_CONCERNS].
* Confirm termination and liability allocations align with market norms for the document type.
* Run a final contradiction check: termination vs. survival, caps vs. excluded losses, governing law vs. forum.
* Confirm that each risk item maps to a concrete edit or negotiation lever.
* Ensure reading level and tone match [DESIRED_READING_LEVEL] and [DESIRED_TONE].
* Cross‑check that acceptance failures suspend payment obligations where appropriate.


JavaScript is disabled. Select all text in the box and copy it manually.

________________________________

Suggested Follow-Up Prompts

– Draft objective acceptance criteria wording for a complex data migration.
– Propose a change control form template with impact assessment fields.
– Create a milestone/payment schedule aligned with critical path items.

Tips for This Prompt

– Paste any referenced schedules (test plan, architecture) into [KEY_LEGAL_TEXT] for completeness.
– Make [KEY_CONCERNS] concrete (e.g., deemed acceptance, re‑test windows, change fees).